CNC woodworking engraving machine installation precautions



After many customers purchased the CNC carpenter engraving machine, they did not know how to unload the goods, the equipment was debugged, etc., which also brought some harm. Although our engraving machine technicians will arrive at the customer's factory in time after the customer's CNC carpenter engraving machine arrives, but because the customer receives the equipment and wants to accept it in time, perhaps some customers belong to the equipment again, and we are not allowed to engrave the machine technician. In the past, debugging, training, etc., I thought that I was able to install and debug equipment independently, but I often did not pay attention to some small details, which would also cause damage to the equipment. Then, after receiving the goods, how to install and debug the CNC carpenter engraving machine?

1. After the carpenter arrives, unpack the machine and remove the machine from the bottom. Place the machine in a horizontal position. During the placement process, do not touch the machine.

2. After the carpenter engraving machine is placed, open the random toolbox, take out the wires and connect to the power supply, and connect the air plug according to the line number to check whether the circuit operation is normal.

3. Connect the computer and the carpenter engraving machine with the control, and open the corresponding driver and application software of the computer device. (For details, please refer to the user manual of the engraving engraving machine or the CD-ROM)

4. After the driving device is finished, set the internal parameters, turn the carpenter engraving machine to check whether the machine running direction is correct, and the stroke is accurate.

    Also pay attention to the environment of the carpenter engraving machine operation, especially the humidity and temperature in the workshop; when the temperature is lower than zero, the liquid in the water-cooled spindle motor should be released; when the engraving machine is operated, the humidity should be controlled within 75%. Good, if the situation is special, it will not exceed 95% in a month.